The ISYS® building site management system is a software platform for large scale industrial building projects.
It works on a homogeneous data basis and makes the complete implementation of all processes in the construction of industrial buildings possible.
The ISYS® construction management system supports the whole project team with work preparation, material purchasing, warehouse administration, waste optimization, progress management as well as accounting and batch tracing.
The system generates manning levels as well as records of working hours and links material expenses automatically with consumption data. ISYS® enables mobile data acquisition and the application of bar codes on material or equipment that must be marked and helps the user access data on the construction site at any time.
The web based construction site information system, short BIS, drastically shortens the communication ways between contracting partners of a building project. It offers an enterprise-general realization of the construction progress as well as the possibility to distribute tasks. Standardized measurements can be written with the accounting component in the ISYS® building site management system and informative reports can be generated without a problem.
The user can understand material qualities and material quantities regarding integrated batch tracing any time.
The ISYS® building site management-system is based on the many years experience of our enterprise as a construction site outfitter. ISYS® is adapted therefore to building sites and their appropriately predominant conditions in an ideal way.
The ISYS® building site management system represents a well tested instrument, proven in its ability to control the dynamics of complex industrial plants and day to day building sites. These facts are based on account of the practical development of ISYS® over several years, considering its direct relation to and application on construction sites.
A maximum in quality attainment has been achieved by the permanent application of the system in process and sequence controlling as well as in the area of quality management, an achievement which must be reflected in a long-lived and efficiently established industrial facility.
The Most vital functions:
Work schedule
- Generation of work schedules including assignment of resources
- Assignment of required appointments, data bank supported clearance mechanisms
Materials management and control
- Minimum quantity administration
- Automatic order proposals based on queued working packages and delivery times
- Precise consumption monitoring of materials
Storage Management
- Computer assisted storage management
- Safe stocktaking
- Material and tools monitoring
Material scheduling, waste minimization
- Cable ordering in line with logistic and consumption-diminishing aspects
- Minimization of the waste to <5%
Construction plan control
- Event based status change of working tasks
- Electronically generated order documents